St Ambrose College, Altrincham

REINFORCED CONCRETE GROUNDWORKS, STRUCTURES, DRAINAGE AND EXTERNAL LANDSCAPING WORKS FOR A NEW SECONDARY SCHOOL.

DIVISION

CLIENT

Balfour Beatty

VALUE

£2.4m

DURATION

65 weeks

[wbcr_php_snippet id=”8303″]

Overview

The school was designed around the concept of a celtic cross. The new swimming pool forming the stem and main building being the head of the cross. A guided auger bore was used to construct the main drainage outfall in order to protect existing oak trees and limit disruption to main drop off point to the existing school.

ADDITIONAL IMAGES

Head Office

Victoria House
3 Huntsman Drive
Irlam
Greater Manchester
M44 5EG

T: 0161 776 6940

Yorkshire Office

Unit 2, Calder Close
Calder Park
Durkar
Wakefield
WF4 3BA

T: 01924 682 007

Liverpool Office

4101 Charlotte House
Queens Dock Business Village
67-83 Norfolk Street
Liverpool
L1 0BG

T: 0151 706 0713