EMERGENCY CONTROL OF AND RENEWAL 300MTS OF 700MM DIAMETER MAIN OUTFALL PUMP SEWER.

DIVISION

CLIENT

Amey-United Utilities

VALUE

£1.7m

DURATION

60 weeks

[wbcr_php_snippet id=”8303″]

Overview

Carried out as part of the AMEY/UU alliance framework agreement Cara were contracted to carry out the emergency control of a 700 dia. Rising main FW sewer and subsequent repair. The existing sewer was found to be leaking directly into the River Irwell causing serious environmental issues. Cara assisted in the installation of circa 600mts of overland 600mm temporary pump main through an area of natural beauty. The new main was placed across the River Irwell and subsequent chambers constructed. An extensive reinstatement landscape package was carried out to bring the park back to its original beauty. Control of all specialist contractor’s was appointed and managed by CCL.

ADDITIONAL IMAGES

Head Office

Victoria House
3 Huntsman Drive
Irlam
Greater Manchester
M44 5EG

T: 0161 776 6940

Yorkshire Office

Unit 2, Calder Close
Calder Park
Durkar
Wakefield
WF4 3BA

T: 01924 682 007

Liverpool Office

4101 Charlotte House
Queens Dock Business Village
67-83 Norfolk Street
Liverpool
L1 0BG

T: 0151 706 0713